PIA10903: "Dodo-Goldilocks" Trench Dug by Phoenix


“Dodo-Goldilocks” Trench Dug by Phoenix

Caption:

This color image was acquired by NASA's Phoenix Mars Lander's Surface Stereo Imager on the 19th day of the mission, or Sol 19 (June 13, 2008), after the May 25, 2008, landing. This image shows one trench informally called "Dodo-Goldilocks" after two digs (dug on Sol 18, or June 12, 2008) by Phoenix's Robotic Arm. The trench is 22 centimeters (8.7 inches) wide and 35 centimeters (13.8 inches) long. At its deepest point, the trench is 7 to 8 centimeters (2.7 to 3 inches) deep.

White material, possibly ice, is located only at the upper portion of the trench, indicating that it is not continuous throughout the excavated site. According to scientists, the trench might be exposing a ledge, or only a portion of a slab, of the white material.

Background Info:

The Phoenix Mission is led by the University of Arizona, Tucson, on behalf of NASA. Project management of the mission is by NASA's Jet Propulsion Laboratory, Pasadena, Calif. Spacecraft development is by Lockheed Martin Space Systems, Denver.

Photojournal Note: As planned, the Phoenix lander, which landed May 25, 2008 23:53 UTC, ended communications in November 2008, about six months after landing, when its solar panels ceased operating in the dark Martian winter.

Cataloging Keywords:

Name Value Additional Values
Target Mars
System
Target Type Planet
Mission Phoenix
Instrument Host Phoenix Lander
Host Type Lander
Instrument Robotic Arm Solid-State Imaging (SSI)
Detector
Extra Keywords Color
Acquisition Date
Release Date 2008-06-16
Date in Caption 2008-05-25 2008-06-12, 2008-06-13
Image Credit NASA/JPL-Caltech/University of Arizona/Texas A&M University
Source photojournal.jpl.nasa.gov/catalog/PIA10903
Identifier PIA10903