PIA10767: Phoenix Lander Work Area


Phoenix Lander Work Area

Caption:

This image shows NASA's Phoenix Mars Lander Robotic Arm work area with an overlay. The pink area is available for digging, the green area is reserved for placing the Thermal and Electrical Conductivity Probe (TECP) instrument. Soil can be dumped in the violet area.

Images were displayed using NASA Ames "Viz" visualization software.

Background Info:

The Phoenix Mission is led by the University of Arizona, Tucson, on behalf of NASA. Project management of the mission is by NASA's Jet Propulsion Laboratory, Pasadena, Calif. Spacecraft development is by Lockheed Martin Space Systems, Denver.

Photojournal Note: As planned, the Phoenix lander, which landed May 25, 2008 23:53 UTC, ended communications in November 2008, about six months after landing, when its solar panels ceased operating in the dark Martian winter.

Cataloging Keywords:

Name Value Additional Values
Target Mars
System
Target Type Planet
Mission Phoenix
Instrument Host Phoenix Lander
Host Type Lander
Instrument Solid-State Imaging (SSI)
Detector
Extra Keywords Color, Thermal
Acquisition Date
Release Date 2008-06-04
Date in Caption
Image Credit NASA/Ames
Source photojournal.jpl.nasa.gov/catalog/PIA10767
Identifier PIA10767